Case Studies
Explore practical commercial building, school refurbishment and public-building projects delivered by our Kent team.

NKC Dartford – Hairdressing Studio
Refresh of North Kent College's Dartford hairdressing studio, including strip-out, electrical works, redecoration, new worktops, sinks, mirrors and beauty lighting.

NKC Dartford – M Block Theatre Conversion
Conversion of the former M Block theatre into a modern, open-plan college common room, including strip-out, reconfiguration, new windows, redecoration, office construction and toilet refurbishment.

Cedar Children's Academy – Canopy Reroof
Aged polycarbonate roofing stripped and replaced with a new felt roof across the full length of the school canopy — a proper fix that will last.

Hangleton Primary School – The Summer Refurb
Full corridor refurbishment — decoration, suspended ceilings and new flooring — delivered over the school holidays and handed back ready for September.

Gordon Children's Academy – Structural Timber Frame & Roofing
Structural alterations to a deteriorated existing outdoor structure — new timber supports installed and roof covering to follow, restoring a safe covered space for the children.

New Horizons Children's Academy – Brick Retaining Wall
A full-run brick retaining wall delivered at New Horizons Children's Academy — engineered with drainage membrane, hardcore backfill, and gate piers. Built to last.

NKC Hadlow – Site Works
Structural equine barn repairs and a full washdown bay installation for the Animal Management Unit at Hadlow College, Kent.

North Kent College – Gravesend External Painting
External painting works to refresh and protect key elevations across the Gravesend campus.

All Faiths Children’s Academy – Nursery Conversion
Conversion of a redundant room into a bright, practical nursery space to support early years provision.

Ravens Wood School – Canopy
Installation of a timber framed canopy to provide shelter for students outside the Technical High School.

All Faiths Children’s Academy – Nursery Timber Canopy
Design and installation of a new timber canopy to create a sheltered, practical nursery entrance.

RAAC Remediation Support Works
Installation of timber support structures for RAAC concrete remediation across multiple schools.

Hadlow College – Animal Management Building
Full refurbishment of specialised animal management facilities, ensuring high welfare standards.

Portsmouth Academy – Roofing Refurbishment
Refelting of 1,300m² of roof area across the sports hall and main office to improve weatherproofing.

NKC Hadlow College – Tile Hanging Replacement
Replacement of existing tile hanging with fire-resistant cement Hardie board cladding on residential buildings.

NKC Hadlow College Refurbishment
Conversion of a former garden centre into a modern student common room and teaching spaces.

Victory Academy – Security Fencing
Installation of security fencing to define boundaries and enhance site safety.

Victory Academy – Safe Access Route
Construction of new steps and pathway to improve student safety and access from the main road.

Holcombe Grammar – Thinking Facilities
External ground works and landscaping to create durable 'Thinking Facilities' for student wellbeing.

The COOK Kitchen Warehouse Refurbishment 2024
Creation of new toilet facilities, staff tea area, and upstairs office within an operational warehouse.

The COOK Kitchen Office Refurbishment
Conversion of industrial warehouse space into modern office accommodation and staff welfare facilities.
