NKC Hadlow College – Tile Hanging Replacement
    Education

    NKC Hadlow College – Tile Hanging Replacement

    Project Details

    Client
    NKC Hadlow College
    Location
    Hadlow, Kent
    Duration
    4 Weeks
    Value
    Confidential

    Overview

    This critical safety upgrade involved the removal of existing tile hanging on student residential buildings and mobile units. Walkem Group installed fire-resistant cement Hardie board cladding, significantly improving fire safety standards while modernising the buildings' exterior appearance. The works were carried out efficiently during a low-occupancy period.

    Project Gallery

    NKC Hadlow College – Tile Hanging Replacement detail 1
    NKC Hadlow College – Tile Hanging Replacement detail 2
    NKC Hadlow College – Tile Hanging Replacement detail 3
    NKC Hadlow College – Tile Hanging Replacement detail 4
    NKC Hadlow College – Tile Hanging Replacement detail 5
    NKC Hadlow College – Tile Hanging Replacement detail 6

    The Challenge

    The primary challenge was removing the old tiles without damaging the underlying timber structure. Ensuring the new fire cement board was installed to rigorous fire safety specifications was paramount. Weather conditions in January also posed logistical challenges.

    Our Solution

    Our team implemented careful removal techniques to preserve the structural integrity of the buildings. We worked closely with fire safety consultants to ensure all new cladding met the highest compliance standards. Flexible programming allowed us to mitigate weather delays, completing the project on schedule.

    Key Features

    Bespoke Joinery & Finishes
    Sustainable Systems Integration
    Live Environment Management
    Accredited Health & Safety